The Netherlands
Next to one of Amsterdam its busiest highways, the A10, BMW realised a new showroom, maintenance garage and parking garage. Loading Systems supplied sectional overhead doors with full vision panels to maximise natural lighting. The doors are equipped with our sophisticated controls and specific operating options.
Sweden
BMW invested in a new spare-parts warehouse in Staffanstorp, Sweden. The parts warehouse will be used to distribute the BMW spare-parts throughout Scandinavia.
Loading Systems installed 26 sectional overhead doors. 20 of these doors are at loading bays, the other doors are installed at level-access ramps to enter the building.
15 loading bays are installed with our swing lip dock leveller and curtain dock shelter. These bays are used by regular trucks. We have installed one jumbo telescopic lip dock leveller for extra high trailers.
The remaining 4 docks are equipped with special loading plates. These loading bays allow delivery vans to dock at the warehouse.
All 20 docks are equipped with extra accessories to make loading and unloading easier and safer. These accessories include dock lights, safety bollards and dock number plates.